Configuration
This page documents some of the configuration that a technical user can do to customize the solution to a customers needs.
Provisioning Dashboards for New Plants
A Plant Management Dashboard and Master Data Dashboard have to be provisioned for each plant added to the solution.
Make sure that both dashboards have the same plant identifier.
- Plant Management
- Master Data
To provision a plant management dashboard, execute the method Create Plant Management Dashboard in the object Plant Management - Dashboard.
| Variable | Description |
|---|---|
| Environment | Environment selector to differentiate between Development, Testing, Acceptance and Production dashboards. |
| Plant | Plant identifier for which a dashboard has to be provisioned. |
| Suffix | An optional suffix to customize the dashboard url. |
| Site Name | The final site name used for the sharepoint site for this dashboard. This value is generated by combining the other inputs as follows: {$EnvironmentPrefix}{$Plant}PlantManagement{$Suffix}. If the environment is production, then the value is combined instead as {$Plant}PlantManagement{$Suffix}. |
To provision a master data dashboard, execute the method Provision Dashboard in the object Master Data - Dashboard.
| Variable | Description |
|---|---|
| Environment | Environment selector to differentiate between Development, Testing, Acceptance and Production dashboards. |
| Plant | Plant identifier for which a dashboard has to be provisioned. |
| Suffix | An optional suffix to customize the dashboard url. |
| Site Name | The final site name used for the sharepoint site for this dashboard. This value is generated by combining the other inputs as follows: {$EnvironmentPrefix}{$Plant}MasterData{$Suffix}. If the environment is production, then the value is combined instead as {$Plant}MasterData{$Suffix}. |
When provisioning a new dashboard only the user used to provision the dashboards will have access. Refer to permissions to give other users access as well.
Setting Stop Thresholds
The solution has two stop thresholds that change when a downtime is considered a short stop, just a stop or a long stop. These thresholds can be configured by changing their values in the plantmanagement config database table. These values are stored in seconds.
- Short Stop
- Long Stop
The short stop duration defines a value under which stops will be considered short stops. Any stops shorter than this value will not show up on the stop timeline graph or the stop summary overview. Short stops are still included in total downtime and OEE calculations.
Long stops are stops that last longer than the configured threshold. These stops will be marked on the stop summary overview. When filtering for long stops all shops shorter than this threshold will be filtered out.