The plant management solutions provides a default set of KPIs. The master data dashboard allows a user to configure a few properties of these KPIs. These properties will have an impact on how the KPI is displayed on the Machine Details, Daily & Weekly Operations and OEE pages. The following properties can be configured:

PropertyDescription
LabelThe label that is shown to end users for this KPI. This property allows users to customize what KPIs are called without changing the underlying references or meanings.
DescriptionAn optional description of the KPI.
EnabledIf the KPI should be shown on dashboards or not. This only has an impact on the Machine Details and Daily & Weekly Operations pages.
Background ColorThe background color for the KPI tiles.
Font ColorThe font color for the KPI tiles.

Kpi Definitions​

The available KPIs are:

Kpis

Planned​

The Planned KPI displays how many pieces were planned to be produced on a machine for the selected time period.

The total amount of items planned to be produced for a machine over the selected time period.

Yield ERP​

The Yield ERP KPI displays how many pieces were reported to an ERP system on a machine for the selected time period.

Sum of the amount of items reported back to ERP on a given machine for the selected time period.

Parts Produced​

The Parts Produced KPI displays how many pieces were produced on a given machine for the selected time period.

Sum of all pieces produced on a given machine for the selected time period.

Scrap​

The Scrap KPI displays how many pieces were scrapped on a given machine for the selected time period.

Total amount of pieces scrapped on a given machine for the selected time period.

Downtime​

The Downtime KPI shows the total time that a machine was stopped during a selected time period.

Sum of all stops in days.hours:minutes:seconds that a machine was stopped during a selected time period.

Scheduled Downtime​

The scheduled downtime shows the amount of time that a machine was stopped during a selected time period for which a reason with a scheduled category was selected.

Sum of all stops in days.hours:minutes:seconds that a machine was stopped during a selected time period with a Scheduled reason.

Planned Downtime​

The planned downtime shows the amount of time that a machine was stopped during a selected time period for which a reason with a planned category was selected.

Sum of all stops in days.hours:minutes:seconds that a machine was stopped during a selected time period with a Planned reason.

Unplanned Downtime​

The unplanned downtime shows the amount of time that a machine was stopped during a selected time period for which a reason with a unplanned category was selected.

Sum of all stops in days.hours:minutes:seconds that a machine was stopped during a selected time period with a Unplanned reason.

Unjustified Downtime​

The unjustified downtime shows the amount of time that a machine was stopped during a selected time period for which no downtime reason was selected.

Sum of all stops in days.hours:minutes:seconds that a machine was stopped during a selected time period where the stops did not get a downtime reason.

OEE​

OEE (Overall Equipment Effectiveness) measures how efficiently a machine ran during the time it was planned to produce. It calculates the ratio between efficient manufacturing time vs total manufacturing time and gives more insights into three possible losses of efficiency (Availability, Performance, Quality).

The OEE for a single machine can be calculated in two ways:

Complete calculation

The complete calculation calculates OEE by multiplying it's three components. This calculation is used when the component values are also needed, for example on the oee page.

Complete OEE

Simple Calculation

If you write out the calculations of each component in the above formula it is possible to scratch some elements, leading to a simpler calculation. This calculation is only used when the individual components are not needed, as it is more performant but does not allow you to use those underlying components.

Simple OEE

Availability​

Availability is one of the components of OEE. It measures the ratio between the time that a machine produces and the time that a machine was stopped. This KPI only includes stops that are not scheduled.

Availability is calculated in terms of Planned Production Time and actual Run Time.

Ava

Performance​

Performance is one of the components of OEE. It calculates how efficient a machine produced by comparing the actual production rate to the theoretical maximum production rate.

Performance looks at all produced pieces and compares how much time was spent on these pieces with how much time should have been spent if the machine ran perfectly.

Perf

Quality​

Quality is one of the components of OEE. It calculates the ratio of pieces produced that are good vs the pieces produced that had to be scrapped.

Qua

Deleting a KPI​

Only custom KPIs can be deleted.